198-21-11490 wheels for Shanui bulldozer spare part
198-21-11490 wheels for Shanui bulldozer spare part for sale:
1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service
描述
198-21-11490 wheels for Shanui bulldozer spare part for sale:
CCMIE Group started to sell spare parts for XCMG, Shantui, SANY, SDLG, Komatsu, and Cummins engines in 2011. We have established four spare parts warehouses in Xuzhou, Jining, Kunshan, and Changsha in China, providing customers worldwide with a wide variety of high-quality spare parts. Our spare parts system can provide you with accurate and competitive prices in the shortest possible time. We are confident that we will become your excellent business partner!
1. As accessories’ prices fluctuate wildly, please consult us for details such as specific prices and shipping costs!
2. There are many kinds of accessories, which cannot be displayed one by one. We can find the correct accessories for you if you have the accessory part number/accessory nameplate/picture/machine nameplate!
3. We have a large inventory of commonly used spare parts in our warehouse, which can be delivered within three days!
Part Number: 198-21-11490
Part name: wheels
Applicable models: all types of bulldozers
Brand: Shantui
Due to too many types of spare parts, we cannot display them all on the website. Please feel free to contact us for specific information. The following are some other product part numbers related to the 198-21-11490 wheels for Shanui bulldozer spare part:
753-61-57900 713-61-12000
D2252-08040 A1027020T
33Y-62-00003 NJ2311
07018-20502 16T-14-00012
242-56-08000T 222-18-01013
222-45-08000Z 72D-01-02000
111-15-00033 635416285
411-62-15000 175-61-13561
04254-11032 195-43-24560
31Y-25-02000 10Y-03-00008
3802376 31Y-75A-00001
YQ16-27.3-19 31Y-15A-00054
07000-35055 steering pump
263-76-00002-1 72P-66-01000
18Z-12-16000 SE240-PSCGL
GB/T288-22212 JB999-77M27*2*55
31Y-15-00022 16Y-80-70004
4025334 3932453
113-63-00001 54100006
31Y-61-03006 07012-00075F
23Y-07B-05000 0750115109
13056682 HSGF*80/45BE-EG
263-56-01000T B07-01B-06000
111-75-03007 222-18-01014
GB301-8310 175-60-26114
16Y-82G-00001 B07-64-00000
07235-10311 18J-16-04000
16L-80-50000LS 154-57-30007
146163 23Y-04B-02000
3040292 YJH265
07109-20536 266-31-03000
175-15-62750 422-62-04000-1
23Y-89-10007 26R-05-00001
244-04-03000 175-71-11454
145701 411-01-10000-1
Our company also supplies the four-wheel area of the chassis parts of bulldozers and excavators. The products are as follows:
(1) Shantui four-wheel area: Shantui guide wheel, Shantui drive wheel, Shantui support sprocket, Shantui drive wheel, Shantui tension, Shantui professional oil, Shantui sprocket tooth block, Shantui knife Angles, Shantui blades, Shantui construction machinery bolts, Shantui chain rails, Shantui track shoes, Shantui bucket teeth.
(2) Four-wheel belt: PC60. pc100. pc120, PC130. PC200, pc220. pC300. PC360. Pc400 series excavator driving wheels, guide wheels, tug wheels, driving teeth, tensioning devices, chains.
(3) Yuchai four-wheel area: Yuchai yc85 driving wheel, Yuchai yc85 supporting wheel, Yuchai yc85 tensioning device, Yuchai 55 guiding wheel, Yuchai yc55 driving wheel, Yuchai yc55 tensioning device.
(4) Kobelco four-wheel area: Kobelco sk200-3 driving wheel, Kobelco 200-6 supporting wheel, Kobelco 200-3 supporting wheel, Kobelco 200-6 driving wheel.
(5) Sumitomo four-wheel area: Sumitomo 120 driving wheels, Sumitomo 200 driving wheels, Sumitomo 200 supporting wheels.
(6) Carter’s four-wheel area: Carter driving wheels, Carter supporting wheels, Carter guiding wheels,
(7) Doosan four-wheel area: Doosan dh55 driving wheels, Doosan dh220 driving wheels, Doosan dh220 supporting wheels.
(8) Three-one four-wheel belts: Three-one sy130 supporting wheels, three-one sy130 driving wheels, three-one 300 supporting wheels, and three-one 300 driving wheels.
Product Quick Navigation | ||||
FAQ
Q1: What payment methods can you accept?
T/T, Western Union, PAYPAL, Bank of China, HSBC
Q2: Can you pack me according to my request? How is the product packaged?
Yes, it is exported in neutral packaging in wooden or cardboard boxes.
Q3: What is the delivery time?
1) Spot: usually 3-5 days. It can be as fast as 24 hours.
2) Out of stock: According to the quantity you require, usually 10-20 days, but we have a large amount of inventory.
Q4: What kind of transportation can you provide?
1) Large quantities of orders: sea or air freight. (We can give you the best price)
2) Small batch orders: DHL, TNT, UPS, FedEx, EMS, ARAMEX
Q5: Do you accept small orders?
Yes, small orders can be accepted.
Q6: What products can your company provide?
1) CCMIE brand hydraulic pump valves and other products, OEM, 100% genuine parts, COPY (made in China).
2) Genuine spare parts.