XGL300-18S erecting tower crane for sale
The model XGL300-18S erecting tower crane is a new-type tower crane for construction.
Model: XGL300-18S
Maximum lifting weight: 18t
Rated lifting moment: 300t.m
Fixed height: 55m
描述
Product Introduction
The XGL300-18S erecting tower crane is a new type of tower crane for construction. The luffing boom, trolley slewing, and higher slewing systems distinguish this multi-purpose self-elevating tower crane. This tower crane is mostly employed in the construction of high-rise hotels, residential buildings, high-rise industrial buildings, long-span industrial workshops, stadiums, bridges, chimney stalks, and silos, among other structures.
A tower crane is a slewing crane whose boom is mounted on the top of a towering tower. It has a large working range and is mainly used for vertical transportation and component installation of materials in the construction of multi-storey and high-rise buildings. It consists of three parts: metal structure, working mechanism and electrical system. Metal structures include towers, booms, bases, attachment rods, etc. The working mechanism has four parts: lifting, luffing, turning and walking. The electrical system includes motors, controllers, power distribution boxes, connecting lines, signals and lighting devices.
Main Parameters
Item | Unit | Parameter |
Model | - | XGL300-18S |
Boom length/arm end lifting weight | m/t | 60/3.2 |
Rated lifting moment | t.m | 300 |
Maximum lifting weight | t | 18 |
Fixed height | m | 55 |
Swing speed | r/min | 0~0.7 |
Lifting power | kW | 67 |
Luffing power | kW | 45 |
Remarks: This product is continuously improved with the progress of technology. The difference between the parameters and structural characteristics listed above is subject to the actual product.
Performance Characteristics
1. The entire tower crane is very easy to mount and demount.
2. The lifting mechanism, luffing mechanism, and slewing mechanism are equipped with industry-leading and reliable speed-regulating technology, allowing for smoother and more reliable operation with less impact.
3. Wide operating range, multi-style work, and application breadth.
4. The electrical control elements are imported and are trustworthy and long-lasting.
- All relevant spare parts for the XGL300-18S erecting tower crane are available.
Product Images
CASE RECOMMEND